Geology
Engineering-geological surveys, 500 MW solar plant (Sherabad)
Engineering-geological surveys, 500 MW solar plant (Sherabad) · Client: China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Engineering-geological surveys at the construction site of a 500 MW solar power plant in the Sherabad district, Surkhandarya region
Project details
Field
Geology
Type of work
Engineering-geological surveys, 500 MW solar plant (Sherabad)
Client
China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Service
Geophysical surveys
Similar projects
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Client: ГУ «Дирекция по строительству города новый Ташкент при Кабинете Министров Республики Узбекистан»
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Client: ИП OOO "CEEC TIANJIN ELECTRIC POWER CONSTRUCTION"
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Client: OOO "JURU ENERGY CONSULTING"
Engineering-geological surveys (535 m drilling): Webster University and a school, «New Tashkent»
Engineering-geological surveys (535 m drilling): Webster University and a school, «New Tashkent»
Client: ГУ «Дирекция по строительству города новый Ташкент при Кабинете Министров Республики Узбекистан»
Drilling works (2000 m), Fergana region
Drilling works (2000 m), Fergana region
Client: OOO "HEJINHUA GROUP"
Cross-hole wave velocity measurements, 500 MW WPP (Bash, Zangeldy)
Cross-hole wave velocity measurements, 500 MW WPP (Bash, Zangeldy)
Client: OOO "HEJINHUA GROUP"