Geology
Engineering-geological survey of a power line (51 km), 500 MW solar plant (Sherabad)
Engineering-geological survey of a power line (51 km), 500 MW solar plant (Sherabad) · Client: China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Engineering-geological survey of a power line (51 km) at the construction site of a 500 MW solar power plant in the Sherabad district, Surkhandarya region
Project details
Field
Geology
Type of work
Engineering-geological survey of a power line (51 km), 500 MW solar plant (Sherabad)
Client
China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Service
Geophysical surveys
Similar projects
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Client: OOO "JURU ENERGY CONSULTING"
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Client: ГУ «Дирекция по строительству города новый Ташкент при Кабинете Министров Республики Узбекистан»
Engineering-geological surveys, combined power plant 1500–1700 MW (Uchkizil, Termez)
Engineering-geological surveys, combined power plant 1500–1700 MW (Uchkizil, Termez)
Client: «SEPCOIII Electric Power Construction Co. LTD»
Topographic-geodetic and engineering-geological surveys, 500 MW WPP (Samarkand)
Topographic-geodetic and engineering-geological surveys, 500 MW WPP (Samarkand)
Client: UNIVERSAL INTERNATIONAL ENGINEERING HOLDINGS PTE. LTD
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Client: ИП OOO "CEEC TIANJIN ELECTRIC POWER CONSTRUCTION"
Geotechnical surveys, LNG peak-shaving facility (Syrdarya, Tashkent, Turakurgan)
Geotechnical surveys, LNG peak-shaving facility (Syrdarya, Tashkent, Turakurgan)
Client: SEPCOIII ELECTRIC POWER CONSTRUCTION CO., LTD.
Need a similar project?
Leave your phone — we will call back, clarify the task and estimate the cost of work.