Geology
Cross-hole wave velocity measurements, 500 MW WPP (Bash, Zangeldy)
Cross-hole wave velocity measurements, 500 MW WPP (Bash, Zangeldy) · Client: OOO "HEJINHUA GROUP"
Cross-hole wave velocity measurements at the site of a 500 MW wind power plant in the Bash and Zangeldy districts of the Bukhara region
Project details
Field
Geology
Type of work
Cross-hole wave velocity measurements, 500 MW WPP (Bash, Zangeldy)
Client
OOO "HEJINHUA GROUP"
Service
Geophysical surveys
Similar projects
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Client: ИП OOO "CEEC TIANJIN ELECTRIC POWER CONSTRUCTION"
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Engineering-geological surveys (635 m drilling): National Art Museum of Uzbekistan
Client: ГУ «Дирекция по строительству города новый Ташкент при Кабинете Министров Республики Узбекистан»
Drilling works (2000 m), Fergana region
Drilling works (2000 m), Fergana region
Client: OOO "HEJINHUA GROUP"
Topographic-geodetic and engineering-geological surveys, Andijan PV plant 400 MW
Topographic-geodetic and engineering-geological surveys, Andijan PV plant 400 MW
Client: Powerchina Zhongnan Engineering Corporation Limited
Engineering-geological surveys (535 m drilling): Webster University and a school, «New Tashkent»
Engineering-geological surveys (535 m drilling): Webster University and a school, «New Tashkent»
Client: ГУ «Дирекция по строительству города новый Ташкент при Кабинете Министров Республики Узбекистан»
Engineering-geological surveys, 500 MW solar plant (Sherabad)
Engineering-geological surveys, 500 MW solar plant (Sherabad)
Client: China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Need a similar project?
Leave your phone — we will call back, clarify the task and estimate the cost of work.