Geology
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW · Client: OOO "JURU ENERGY CONSULTING"
Pile testing under two load types at the site of the «Pile drive and Pull-Out Test at 500MW PV Plant» as a part of the 500MW & 772 MWh Samarkand 2 Solar PV & BESS Independent Power Project, located in the Nurabad district, Samarkand region, Republic of Uzbekistan.
Project details
Field
Geology
Type of work
Pile testing (Pile Drive & Pull-Out), Samarkand 2 Solar 500 MW
Client
OOO "JURU ENERGY CONSULTING"
Service
Geophysical surveys
Similar projects
Topographic-geodetic and engineering-geological surveys, 500 MW WPP (Samarkand)
Topographic-geodetic and engineering-geological surveys, 500 MW WPP (Samarkand)
Client: UNIVERSAL INTERNATIONAL ENGINEERING HOLDINGS PTE. LTD
Geotechnical and geophysical works, «Bash and Jankeldy» (Bukhara region)
Geotechnical and geophysical works, «Bash and Jankeldy» (Bukhara region)
Client: FE (CHINA ENERGY INTL GROUP CAS) ООО
Engineering-geological survey of a power line (51 km), 500 MW solar plant (Sherabad)
Engineering-geological survey of a power line (51 km), 500 MW solar plant (Sherabad)
Client: China Machinery Engineering Corporation (CMEC), ООО «HEX Solar»
Topographic-geodetic and engineering-geological surveys, Andijan PV plant 400 MW
Topographic-geodetic and engineering-geological surveys, Andijan PV plant 400 MW
Client: Powerchina Zhongnan Engineering Corporation Limited
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Steel pile test (DVT), photovoltaic plant (Kashkadarya)
Client: ИП OOO "CEEC TIANJIN ELECTRIC POWER CONSTRUCTION"
Geotechnical studies, Nukus WPP (Karakalpakstan)
Geotechnical studies, Nukus WPP (Karakalpakstan)
Client: Power China Huadong Engineering Corporation Limited SINOHYDRO TASHKENT LLS
Need a similar project?
Leave your phone — we will call back, clarify the task and estimate the cost of work.