Design

Thermal power plant and steam boiler design

Design of thermal power plants and steam boilers rated up to 30 MW: heat cycle, boiler…

Thermal power plant and steam boiler design is a critical engineering sector providing continuous, highly efficient electrical and thermal power generation for heavy industries and municipal heating grids. A thermal plant is designed around its heat cycle: the fuel, steam parameters and load regimes determine the main and auxiliary equipment. This section matches the licence category — thermal power plants and steam boilers rated up to 30 MW. Across Tashkent, the Tashkent Region, and throughout the Republic of Uzbekistan, the licensed engineering center GEO PRO delivers turnkey thermal power plant and steam boiler design with guaranteed fuel efficiency, thermodynamic optimization, and positive conclusions from state regulatory authorities.

Rising primary energy costs and strict grid reliability standards require the deployment of modern combined heat and power (CHP), waste heat recovery, and high-efficiency steam cycles. Errors in thermodynamic heat balance calculations or incorrect hydraulic balancing of high-pressure steam headers lead to excessive fuel consumption, boiler tube burnout, premature turbine failure, and costly emergency shutdowns. Professional thermal power plant and steam boiler design ensures balanced steam-water cycles, protects expensive capital assets, and significantly reduces the levelized cost of heat and electricity generation.

When Thermal Power Plant and Steam Boiler Design is Required

In compliance with national energy efficiency regulations, industrial boiler safety standards, and statutory ShNK / KMK building codes of the Republic of Uzbekistan, certified thermal power plant and steam boiler design is essential for the following infrastructure projects:

  • Construction of decentralized industrial CHP plants and cogeneration units up to 30 MW for textile mills, chemical complexes, and metallurgical plants;
  • Engineering large-scale steam and hot-water district heating boiler houses for residential developments and Free Economic Zones (FEZ);
  • Deep modernization, boiler retrofitting, and replacing obsolete steam boilers (DKVr, DE, KE) with automated, high-efficiency packaged units;
  • Integration of back-pressure steam turbines and condensing turbo-generators for waste heat recovery and industrial pressure reduction utilization;
  • Converting existing thermal plants to multi-fuel firing setups (natural gas, heavy fuel oil / mazut, or solid biomass);
  • Engineering waste heat recovery boilers (HRSG) installed behind gas turbine and gas reciprocating engine generator sets (Gensets).

What We Do: Full-Cycle Thermal Power Engineering

The multidisciplinary energy engineering department at GEO PRO executes the full project lifecycle from concept to commissioning:

  • heat cycle calculations and the plant’s thermal and electrical balances;
  • selection of boiler, turbine and auxiliary equipment;
  • design of fuel handling, water treatment and flue gas paths;
  • preparing design and estimate documentation and support during state expert review;
  • developing automated distributed control systems (DCS / SCADA) and emergency safety instrumented systems (SIS);
  • engineering power evacuation schemes, step-up substations (6/10/35/110 kV), and medium-voltage switchgear;
  • drafting environmental protection sections (EIS / ZVOS), dispersion modeling for NOx/CO emissions, and acoustic attenuation design.

Core Technical Blocks in Industrial Thermal Power Plants

When executing complex thermal power plant and steam boiler design, our certified engineers deliver comprehensive blueprints for all plant balance-of-plant (BOP) systems:

  • Boiler Island: Industrial drum-type and once-through steam boilers, superheaters, economizers, air preheaters, and multi-stage gas/fuel-oil burners;
  • Turbine & Powerhouse Island: Steam turbo-generators, condensing systems, pressure reducing and desuperheating stations (PRDS / BROU), and deaerator feed-water pump units;
  • Water Treatment Plant (WTP): Chemical water purification, multi-media filtration, reverse osmosis (RO), ion exchange softening, and demineralization plants;
  • Fuel Handling & Gas Regulating: Gas pressure regulating stations (GDS/GRP), commercial metering skids, fuel oil unloading pumps, and emergency fuel storage tanks;
  • Draft & Flue Gas Systems: Forced draft fans, induced draft fans, insulated ductwork, selective catalytic reduction (SCR) units, and self-supporting/guyed industrial chimneys.

Thermodynamic Modeling and Piping Stress Analysis

High-precision thermal power plant and steam boiler design relies on detailed mathematical modeling of thermal balances across winter, summer, and transition load profiles. GEO PRO specialists perform hydraulic pressure-drop calculations for high- and medium-pressure steam piping, conduct finite-element stress analysis for thermal expansion, specify spring hangers and expansion joints, and implement robust water hammer protection.

Deliverables: Complete Design and Estimate Documentation (PSD)

Design and estimate documentation for the plant: thermal and electrical diagrams, plans and sections of the main building, equipment schedules, safety sections and estimates — through to a positive expert review conclusion.

Clients receive an all-inclusive, execution-ready engineering dossier:

  • Process and instrumentation diagrams (P&ID), thermal cycle flow sheets, and steam-condensate layouts in AutoCAD DWG and PDF;
  • Architectural and structural working drawings for the powerhouse, turbine table foundations, and heavy boiler supports;
  • Electrical single-line diagrams, relay protection logic, and process automation (DCS) architectures;
  • Comprehensive equipment schedules, valve datasheets, and instrumentation specifications;
  • Consolidated capital cost estimates (Smety), bill of quantities (BOQ), and equipment procurement packages;
  • Official positive conclusion from the State Expertise Board and industrial boiler safety inspection authorities.

Pricing and Ordering Thermal Power Engineering Services

Engineering fees are calculated transparently based on total electrical and thermal capacity, steam parameters (pressure, temperature), fuel complexity, and degree of plant automation. GEO PRO engineers are ready to evaluate your thermal load profiles and technical specifications across Uzbekistan.

If your industrial enterprise requires licensed thermal power plant and steam boiler design or turnkey boiler house documentation, contact GEO PRO today. We will deliver an optimized, code-compliant engineering proposal tailored to your operational demands.

Need this service? Leave a request — we’ll estimate the cost for your site. Request an estimate or call: +998 97 744-55-11.

Why choose us

Licenses and permits

We work officially: a laboratory and permits for engineering surveys.

Modern equipment

Modern total stations, GNSS receivers and drilling rigs.

Experienced engineers

Surveyors, geologists and ecologists with specialized education and on-site experience.

Official report

A technical report accepted by expert review bodies and design organizations.

How we work

01

Request and brief

We clarify the task, site and objectives, and agree on the brief and cost.

02

Field work

We go on-site: measurements, survey, drilling and sampling to standards.

03

Processing

Office data processing, calculations and analysis in specialized software.

04

Report

We prepare and deliver an official technical report with results and recommendations.

Our work: design

Projects completed by GEO PRO in this field — total 7.

Relocation of a 220 kV OHL from the «Daryo Bo'yi City» business centre construction zone

Relocation of a 220 kV OHL from the «Daryo Bo’yi City» business centre construction zone

Client: ООО «MIMAR GROUP»
Reconstruction of double-circuit 110 kV OHLs, Kibray district (stage 1)

Reconstruction of double-circuit 110 kV OHLs, Kibray district (stage 1)

Client: ООО «YO`L LOYIHA BYUROSI»
Reconstruction of double-circuit 110 kV OHLs, Kibray district (stage 2)

Reconstruction of double-circuit 110 kV OHLs, Kibray district (stage 2)

Client: ООО «YO`L LOYIHA BYUROSI»
Design (DED): 35/10 kV substation (2×6.3 MVA) and 35 kV OHL, «Navbahor small industrial zone»

Design (DED): 35/10 kV substation (2×6.3 MVA) and 35 kV OHL, «Navbahor small industrial zone»

Client: Навоий Худудий Электр Тармоклар
Design (DED): 110 kV OHL and 110/35/10 kV substation (2×25,000 kVA), «Khazarasp» (Khorezm)

Design (DED): 110 kV OHL and 110/35/10 kV substation (2×25,000 kVA), «Khazarasp» (Khorezm)

Client: Хоразм Худудий Электр Тармоклар
Relocation of a single-circuit 110 kV OHL from a construction zone (Khavast district)

Relocation of a single-circuit 110 kV OHL from a construction zone (Khavast district)

Client: Сырдарьё Худудий Электр Тармоклар
Relocation of a double-circuit 110 kV OHL «L-Korasuv-1,2» from a construction zone

Relocation of a double-circuit 110 kV OHL «L-Korasuv-1,2» from a construction zone

Client: Региональные Электрические сети

All GEO PRO projects →

Step 1 / 4

Describe your task

Project timeline?

Please select an option.

Where is the work to be carried out?

Please select an option.

How can we reach you?

Please enter a valid phone number.

Thank you! Your request has been received

We will estimate the cost for your site and contact you shortly.

Многостраничный сайт — MXMEDIA